COMMERCIAL
CULTURAL
EDUCATION
RESIDENTIAL
MASTERPLANNING
HOTELS
INTERIORS
Landscape
363 George Street
Audi Lighthouse Terminal
Britomart Precinct
CTS Tower
Darling Island Stage 3
Governor Macquarie Tower
Governor Phillip Tower
Hanoi Petroleum Trading Centre
Westpac Place
Quarantine and Inspection Building
SIP Moon Bay Site B-2
Suzhou Commercial Building
Suzhou Logistics Centre
Suzhou Logistics Building
Suzhou Merchant Bank Building
Suzhou Oriental Plaza
Suzhou Taxation Building
120 Pitt Street
Britomart Central
Suzhou China Mobile
Suzhou Doug Wu Securities
Cruise Passenger Terminal
48 Martin Place
> 1
Darling Island Stage 3
The design for Darling Island Stage 3 is predicated on a strong environmental initiative to provide an office building that responds to the site orientation and achieving a minimum of five-star Green Star rating. Additional systems can be incorporated to enhance this to a six-star outcome.

These initiatives has been incorporated into a development concept that is commercially viable and robust enough to respond to the current and future demands of the market.

The use of chilled beams for air conditioning will bring a 30% reduction in greenhouse gas emissions as well as reduced floor to floor heights. Harbour water will be used for mechanical plant heat rejection, eliminating the need for cooling towers. Multi-Water Reuse plant will provide clean water from on-site treatment of various grey and black water sources for non-potable usage.

Pyrmont, Sydney, Australia